New Assiut Combined Cycle Add-on Power Plant

Engineering, Procurement and Construction (EPC)

EPC works of 2 Power Modules of a total capacity of 500 MW; each Module has 1 x 250 MW Steam Turbine, including all auxiliaries and ancillaries. Generated Electricity to be fed to the 220 KV Electricity Grid through the Gas-Insulated Switchgear (GIS) switchyard.