New Capital’s Power Plant Project

Engineering, Procurement and Construction (EPC)

EPC works of 4 Power Modules of a total capacity of 4,800 MW (1,200 MW each); each Module has 2 x 400 MW Gas Turbines and 1 x 400 MW Steam Turbine, including all auxiliaries and ancillaries. Generated Electricity to be fed to the 500 KV Electricity Grid through the Gas-Insulated Switchgear (GIS) switchyard.